After assembly, test the engine before installing it in
the vehicle if possible. If a test stand is not available, use the following
procedure.
- Fill the crankcase with oil.
- If a new camshaft and lifters have been installed, add engine
oil supplement or equivalent to the engine oil.
- Fill the cooling system with coolant.
- Add cooling system sealing pellets or equivalent to the engine
cooling system.
• | Add the pellets directly to the radiator or pressurized coolant
reservoir on systems that do not have caps on the radiator. |
• | Crush the pellets before installation. |
- Crank the engine several times and listen for unusual noises or
any other evidence of mechanical problems.
- Start the engine.
- Listen for any abnormal engine sounds.
- Run the engine at 1000 RPM until the engine is at operating temperature.
- After the engine is at operating temperature, shut the engine
off.
- Inspect the engine carefully for oil or coolant leaks.