Secondary Air Injection Manifold/Pipe Replacement - Bank 2 for Oldsmobile Intrigue 2001
Removal Procedure
- Loosen the shut-off valve
bracket fasteners (2).
- Remove the oil indicator tube. Refer to
Oil Level Indicator and Tube Replacement
in Engine Mechanical.
- Remove the shut-off valve
outlet pipe to the secondary air injection (AIR) manifold fasteners (2).
- Remove the AIR manifold
fasteners (4).
- Remove the AIR manifold (3) from the outlet pipe and vehicle.
- Clean gasket surfaces as necessary.
Installation Procedure
- Install the AIR manifold (3)
to the outlet pipe and vehicle.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the AIR
manifold fasteners (4).
Tighten
Tighten the fasteners to 10 N·m (89 lb in).
- Install the shut-off valve
outlet pipe to the AIR manifold fasteners (2).
Tighten
Tighten the fasteners to 9 N·m (80 lb in).
- Install the shut-off valve
bracket fasteners (2).
Tighten
Tighten the shut-off valve bracket fasteners to 25 N·m
(18 lb ft).
- Install the oil indicator tube. Refer to
Oil Level Indicator and Tube Replacement
in Engine Mechanical.