Removal Procedure
For proper routing and replacement of canister hoses, refer to Emission
Hose Routing Diagram. When replacing hoses, use 6148M or equivalent.
- Disconnect the EVAP lines.
- Be sure to mark the EVAP lines for correct installation.
- Remove the EVAP Canister retainer Bolt.
- Remove the EVAP Canister (2).
Installation Procedure
- Install the EVAP Canister
- Install the EVAP Canister retainer bolt.
- Install the lines to the EVAP canister (2).
Be sure to Install the lines to the correctly