Folding Top Side Rail Link Ball Stud Socket
Notice: Refer to Fastener Notice in the Preface section.
Procedure
- Remove the folding top socket from the folding top link.
- Install the ball-socket to the folding top link.
- Adjust the folding top link ball-socket to 4-6 mm (0.157-0.236 in) (A) from the base/shoulder of the threads, or no more than 4 threads showing on the folding top link .
- Install the washer to the ball-socket and install the ball-socket to the rearmost position in the slot on the support panel.
- Install the nut from the original ball stud.
Tighten 12 N·m (106 lb in) |