Callout
| Component Name
|
Preliminary Procedures
- Remove the instrument panel (I/P) upper trim panel. Refer to
Instrument Panel Upper Trim Panel Replacement.
- Remove the I/P cluster. Refer to
Instrument Cluster Replacement.
- Remove the radio. Refer to
Radio Replacement.
- Remove the HVAC control module. Refer to
Heater and Air Conditioning Control Replacement.
- Remove the bolts and nuts securing the column to the instrument panel, lower and position the steering column out of the way. Refer to
Steering Column Replacement.
|
1
| Instrument Panel Carrier Bolt (Qty: 5)
Caution: Refer to Fastener Caution in the Preface section.
Tighten 9 N·m (80 lb in) |
2
| Instrument Panel Carrier Screw (Qty: 1)
Tighten 9 N·m (80 lb in) |
3
| Instrument Panel Carrier Nut (Qty: 8)
Tighten 9 N·m (80 lb in) |
4
| Instrument Panel Carrier Assembly
Procedures
- Note the location and routing of the instrument panel wiring harness prior to removing the carrier assembly in order to ensure reinstallation.
- Disconnect the electrical connectors.
- With the aid of an assistant, remove the carrier from the vehicle.
- When replacing the carrier assembly, transfer all necessary components.
|