- Install the NEW turbocharger exhaust pipe gasket (1).
- Install the exhaust turbocharger inlet pipe bank 1 (2).
Caution: Refer to Fastener Caution in the Preface section.
- Install the 5 NEW turbocharger exhaust pipe nuts (3) and tighten to
30 N·m (22 lb ft).
- Install the exhaust heat shield bank 1 (2).
- Install the 5 exhaust heat shield bolts (1) and tighten to
10 N·m (89 lb in).