Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Shift Cable (Qty: 2) Procedure
Tip |
2 | Shift Control Lever Fastener (Qty: 4) Caution: Refer to Fastener Caution in the Preface section. Tighten |
3 | Shift Control Lever ProcedureAdjust shift cables after installation. Refer to LINK. |