Removal Procedure
- Remove the I/P carrier. Refer to
Instrument Panel Carrier Replacement
in Instrument Panel, Gauges and Console.
- Remove the front floor
air duct bolt.
- Remove the front floor air duct.
- Remove the module cover screws.
- Remove the module cover.
- Remove the defroster valve actuator from the linkage and vacuum
hose.
Installation Procedure
- Install the defroster valve actuator to the linkage and vacuum
hose.
- Install the module cover.
- Install the module cover screws.
- Install the front floor
air duct.
- Install the front floor air duct bolt.
Tighten
Tighten the front floor air duct bolt to 1.9 N·m (17 lb in).
- Install the I/P carrier. Refer to
Instrument Panel Carrier Replacement
in Instrument Panel, Gauges and Console.