Removal Procedure
- Remove the retainer (2)
from the boss on the heating, ventilation and air conditioning (HVAC) module.
- Remove the push-in retainers (1) from the insulator (3).
- Slide the flange on the insulator (3) from the boss on the HVAC
module.
- Unhook the flange on the insulator (3) from over the kick panel.
- Remove the insulator (3) from the instrument panel (IP).
Installation Procedure
- Align the IP sound insulator
(3) to the bottom of the IP.
- Lift the flange on the insulator (3) over the kick panel.
- Press forward the flange over the boss on the HVAC module.
- Install the push-in retainers (1) to the insulator (3).
- Press the retainer (2) onto the boss on the HVAC module.
- Ensure that the flat sides of the retainers (1) are
facing each other.