Removal Procedure
Important: The intake manifold, throttle body, fuel injection rail, and injectors may be removed as an assembly. If not servicing the individual components, remove the manifold as a complete assembly.
- Remove the engine sight covers. Refer to
Upper Intake Manifold Sight Shield Replacement
.
- Remove the air intake duct. Refer to
Air Cleaner Assembly Replacement
.
- Remove the front suspension support brace. Refer to
Front Suspension Support Brace Replacement
in Front Suspension.
- Disconnect the electrical connector (1) for the fuel injectors.
- Disconnect the electrical connectors (3) from the throttle body.
- Disconnect the fuel feed for the fuel injectors.
- Remove the vacuum hose from the brake booster.
- Disconnect the electrical connector from the manifold absolute pressure (MAP) sensor.
- Remove the MAP sensor (714).
- Remove the grommet (715) from the sensor, as required.
- Remove the evaporative emission (EVAP) clip (740),
bolt (742), bracket (741), valve (730), and tubes (729, 735).
- Remove the intake manifold bolts (512) and fuel rail stop bracket (712).
- Remove the intake manifold (500).
- Remove the intake manifold gaskets (514).
- Discard the intake manifold gaskets.
Installation Procedure
Important: DO NOT reuse the intake manifold gaskets. Install NEW intake manifold gaskets.
Important: The intake manifold, throttle body, fuel injection rail and fuel injectors may be removed as an assembly. If not servicing the individual components, install the intake manifold as a complete assembly.
- Install NEW intake manifold-to-cylinder head gaskets (514).
- Install the intake manifold (500).
- Apply a 5 mm (0.20 in) band of threadlocker GM P/N 12345382 (Canadian P/N 10953489) to the threads of the intake manifold bolts (512).
- Install the intake manifold bolts (512) and fuel rail stop bracket (712).
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the intake manifold bolts.
Tighten
- Tighten the intake manifold bolts at first pass in sequence to 5 N·m (44 lb in).
- Tighten the intake manifold bolts at final pass in sequence to 10 N·m (89 lb in).
- Lubricate the MAP sensor grommet (715) with clean engine oil.
- Install the MAP sensor (714) and grommet (715).
Notice: Refer to Fastener Notice in the Preface section.
- Install the EVAP valve (730), bracket (741), and bolt (742).
Tighten
Tighten the bolt to 50 N·m (37 lb ft).
- Install the EVAP tubes (729, 735).
- Install the fuel rail. Refer to
Fuel Rail and Injectors Installation
in Engine Controls - 6.0L.
- Reconnect the electrical connector for the MAP sensor.
- Install the vacuum hose for the brake booster.
- Reconnect the electrical connectors (3) to the throttle body.
- Reconnect the electrical connector (1) for the fuel injectors.
- Install the front suspension support brace. Refer to
Front Suspension Support Brace Replacement
in Front Suspension.
- Install the air intake duct. Refer to
Air Cleaner Assembly Replacement
.
- Install the engine sight covers. Refer to
Upper Intake Manifold Sight Shield Replacement
.