- Install the cross vehicle beam to the
vehicle.
- Install the RH cross vehicle beam to
hinge pillar bolts finger tight.
- Install the LH cross vehicle beam to
hinge pillar bolts finger tight.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the LH and RH cross vehicle beam bolts to 20 N·m
(15 lb ft).
- Install the retaining bolts to the HVAC
module upper support brackets.
Tighten
Tighten the HVAC module upper support bracket bolts to 10 N·m
(89 lb in).
- Install the HVAC module center support
bracket.
- Install the retaining bolts to the HVAC module center support
bracket.
Tighten
Tighten the HVAC module center support bracket bolts to 10 N·m
(89 lb in).
- Position the instrument panel (IP) wiring harness and install
harness retaining clips.
- Install the BCM bracket and the retaining
bolts.
Tighten
Tighten the BCM bracket bolts to 10 N·m (89 lb in).
- Install the air distribution ducts. Refer to Air Distribution Ducts Replacement - Auxiliary
in HVAC - Manual.
- Install the fuse block to holder
- Install the brake pedal bracket and reinforcement. Refer to
Brake Pedal Bracket Replacement
in Hydraulic Brakes.
- Install the passenger side SIR inflator module. Refer to
Inflatable Restraint Instrument Panel Module Replacement
in Restraint (SIR) Systems.
- Install the IP trim pad. Refer to
Instrument Panel Trim Pad Replacement
.