Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
1 |
Is the voltage within the specified value? | B+ | Go to Step 3 | Go to Step 2 | ||||
2 | Repair the open or poor connection in CKT 39. Is the repair complete? | -- | System OK | -- | ||||
3 |
Is the voltage measured within the specified value | B+ | Go to Step 5 | Go to Step 4 | ||||
4 | Repair the open or poor connection in CKT 640. Is the repair complete? | -- | System OK | -- | ||||
5 | Using a DMM, measure resistance between the following locations:
Is the measured resistance less than the specified value? | 2 ohms | Go to Step 7 | Go to Step 6 | ||||
6 | Repair the open or poor connection in CKT 1450 and/or CKT 1550. Is the repair complete? | -- | System OK | -- | ||||
7 |
Is the repair complete? | -- | System OK | -- |