Notice: To prevent equipment damage, never connect or disconnect the wiring harness connection from the EBCM with the ignition switch in the ON position.
Important: Be careful not to damage seal. Do not pry apart using a tool.
Important: Care must be taken not to damage the solenoid valves when the EBTCM is removed from the BPMV.
Important: Note the location and the orientation of the wave spring in order to aid during installation.
Important: Note the location and the orientation of the wave springs in order to aid during installation.
Important: Only the new wave spring(s) and screws supplied with the new EBTCM should be used.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the top four mounting screws (2) to 2.9 N·m (26
lb in). Tighten screws in an X pattern.
Tighten
Tighten the bottom two mounting screws (2) to 2.9 N·m (26
lb in).