Removal Procedure
- Disconnect the negative
battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine Electrical.
- Release and reposition the remote positive battery cable stud
cover.
- Remove the nut retaining the positive battery cable lead to the
underhood accessory wiring junction block, then reposition the cable lead
away from the junction block.
- Release the coolant recovery
tank hose retainer from the junction block.
- Release the four tabs retaining the junction block to the junction
block retainer and reposition the junction block.
- Disconnect the instrument
panel (IP) wiring harness individual connectors from the junction block.
- Loosen the bolts retaining
the engine, IP and forward lamp wiring harness connectors to the junction
block.
- Disconnect the engine wiring harness connector from the junction
block.
- Disconnect the IP wiring
harness connector from the junction block.
- Disconnect the forward
lamp wiring harness connector from the junction block.
- If accessory wiring junction
block retainer removal is necessary, perform the following:
11.1. | Release the positive battery cable lead retainers from the junction
block retainer, then reposition the cable lead away from the retainer. |
11.2. | Remove the nut retaining the junction block retainer to the strut
tower. |
11.3. | Lift the junction block retainer to release the lower tab and
remove the retainer from the vehicle. |
Installation Procedure
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- If accessory wiring
junction block retainer installation is necessary, perform the following:
1.1. | Position the junction block retainer to the strut tower and insert
the lower tab on the retainer to the slot on the tower. |
1.2. | Install the nut which secures the junction block retainer to the
strut tower. |
Tighten
Tighten the nut to 3 N·m (27 lb in).
1.3. | Position the positive battery cable lead end through the slot
in the junction block retainer, then secure the cable retainers. |
- Connect the forward lamp
wiring harness connector to the junction block.
- Connect the IP wiring
harness connector to the junction block.
- Connect the engine wiring
harness connector to the junction block.
- Tighten the bolts retaining the engine, IP and forward lamp wiring
harness connectors to the junction block.
Tighten
Tighten the bolts to 7 N·m (62 lb in).
- Connect the IP wiring
harness individual connectors to the junction block.
- Position the wiring harnesses
and the accessory wiring junction block to the junction block retainer, align
the four retaining tabs and press into place to secure the junction block.
- Secure the coolant recovery tank hose retainer to the junction
block.
- Install the positive battery
cable lead to the stud on the underhood accessory wiring junction block, then
install the cable lead retaining nut.
Tighten
Tighten the nut to 10 N·m (89 lb in).
- Install the remote positive battery cable stud cover.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine
Electrical.