Removal Procedure
- Remove the right instrument panel (I/P) insulator. Refer to
Instrument Panel Insulator Panel Replacement - Right Side
in Instrument
Panel, Gages, and Console.
- Remove the I/P compartment. Refer to
Instrument Panel Compartment Replacement
in Instrument Panel, Gages, and
Console.
- Remove the screws that secure the recirculation actuator to the HVAC module
assembly.
- Remove the recirculation actuator from the HVAC module assembly.
- Disconnect the electrical connector from the recirculation actuator.
Installation Procedure
- Position the recirculation actuator, aligning the slots in the electric
actuator drive to the flats on the shaft.
- Align the locating hole to the alignment pin on the HVAC module assembly.
- Slide the actuator drive completely onto the shaft, with the mounting
holes flush with the mounting screw holes on the HVAC module assembly.
Notice: Refer to Fastener Notice in the Preface section.
- Install the screws to the recirculation actuator.
Tighten
Tighten the screws to 1.5 N·m (13 lb in).
- Connect the electrical connector to the recirculation actuator.
- Install the I/P compartment. Refer to
Instrument Panel Compartment Replacement
in Instrument Panel, Gages, and
Console.
- Install the right/I/P insulator. Refer to
Instrument Panel Insulator Panel Replacement - Right Side
in Instrument Panel, Gages,
and Console.
- Calibrate the actuator. Refer to
Actuator Recalibration
.