For proper routing and replacement of canister hoses, refer to Emission Hose Routing Diagram . When replacing the hoses, use 6148M or equivalent.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the EVAP canister retainer bolt to 10N·m (88 lb in)
Be sure to connect the lines to the EVAP canister correctly.