- Install a new turbocharger oil return pipe gasket (1).
- Install the turbocharger oil return pipe (2) onto the turbocharger.
Caution: Refer to Fastener Caution in the Preface section.
- Install the turbocharger oil return pipe bolts (3) and tighten to
10 N·m (89 lb in).
- Attach the positive crankcase ventilation (PCV) hose and fitting with O-ring from the camshaft cover
to the turbocharger.
- Install the PCV hose fitting bolt and tighten to
10 N·m (89 lb in).
- Lubricate the O-ring on the turbocharger oil return pipe with clean engine oil.
- Install a new turbocharger gasket (3).
- Install the turbocharger (2) and oil return pipe.
- Install the turbocharger nuts (1).
9.1. | Tighten the turbocharger nuts to 30 N·m (22 lb ft). |
9.2. | Tighten the turbocharger nuts a second time to 35 N·m (26 lb ft). |
- Install the turbocharger brace.
- Install the turbocharger brace nut and tighten to
50 N·m (37 lb ft).
- Install the catalytic converter bracket.
- Install the catalytic converter bracket bolt and nut and tighten to
50 N·m (37 lb ft).
- Install the turbocharger coolant feed pipe.
- Install the turbocharger coolant feed pipe gaskets.
- Install the turbocharger coolant feed pipe bolts.
• | Tighten the turbocharger coolant feed pipe bolts to 20 N·m (15 lb ft). |
• | Tighten the turbocharger coolant feed pipe mounting bolt to 10 N·m (89 lb in). |
- Connect the positive crankcase ventilation (PCV) and hose assembly.
- Install the turbocharger air cooler
outlet pipe.
- Install the turbocharger air cooler outlet pipe bolts and tighten to
25 N·m (18 lb ft).
Caution: Do not twist the turbocharger oil feed pipe. Twisting of the feed pipe will result in the collapse and deformation of the plastic pipe, restricting oil flow and causing turbocharger damage. During
turbocharger replacement, gently push the oil feed pipe towards the front of the engine to clear the turbocharger. Assistance may be required to keep the pipes clear of the turbocharger during removal or installation.
Note: The engine block end of the oil feed pipe fitting has an anti-rotation feature. Ensure that the fitting is fully seated against the block when installing the bolt.
- Install the turbocharger oil feed pipe on the engine block side.
- Install the turbocharger oil feed pipe gasket on the engine block side.
- Install the bolt and tighten to
20 N·m (15 lb ft).
- Install the turbocharger coolant return pipe.
- Install the turbocharger coolant return pipe gaskets.
- Install the turbocharger coolant return pipe bolts and tighten to
20 N·m (15 lb ft).
Caution: Do not twist the turbocharger oil feed pipe. Twisting of the feed pipe will result in the collapse and deformation of the plastic pipe, restricting oil flow and causing turbocharger damage. During
turbocharger replacement, gently push the oil feed pipe towards the front of the engine to clear the turbocharger. Assistance may be required to keep the pipes clear of the turbocharger during removal or installation.
- Install the turbocharger oil feed pipe onto the turbocharger.
- Install the turbocharger oil feed pipe gasket on the turbocharger side.
- Install the turbocharger oil feed pipe bolt and tighten to
20 N·m (15 lb ft).
- Install the catalytic converter seal.
- Install the catalytic converter.
- Install the catalytic converter bolts and tighten to
50 N·m (37 lb ft).
- Install the catalytic converter nuts and tighten to
50 N·m (37 lb ft).
- Install the turbocharger heat shield.
- Install the turbocharger heat shield bolts and tighten to
10 N·m (89 lb in).