Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you complete the Power Folding Top System Check? | -- | Go to Step 2 | |
2 |
Does the folding top operate? | -- | Go to Step 3 | Go to Step 4 |
3 | Replace the folding top switch. Refer to Convertible Top Switch Replacement . Did you complete the repair? | -- | -- | |
4 |
Does the test light illuminate? | -- | Go to Step 5 | Go to Step 6 |
5 | Replace the folding top relay. Did you complete the repair? | -- | -- | |
6 | Measure the resistance in CKT 123 between the folding top switch connector terminal A and the folding top relay connector terminal F. Is the resistance within the specified range? | 0-2 ohms | Go to Step 8 | Go to Step 7 |
7 | Repair the open in CKT 123 between the folding top switch connector terminal A and the folding top relay connector terminal F. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | -- | |
8 | Measure the resistance in CKT 123 between the folding top switch connector terminal A and ground. Is the resistance infinite? | ∞ | Go to Step 9 | |
9 | Repair a short to ground in CKT 123 between the folding top switch connector terminal A and the folding top relay connector terminal F. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | -- |