- Position the output carrier internal gear (3)
on the work table so that the outer splines are facing down.
- Install the intermediate carrier assembly (2) into the output carrier
internal gear (3). Make sure the splines are engaged.
- Install the retaining ring (1) into the output carrier internal
gear (3) so that the intermediate carrier assembly is retained.