GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 828878  Size: SH
  1. Remove the 4 fasteners from the engine cover (1).
  2. Remove the engine cover (1) from the engine.

  3. Object Number: 833112  Size: SH
  4. Remove the air inlet duct (2) from the throttle body assembly (1).
  5. Remove the positive crankcase ventilation (PCV) breather hose (6).
  6. Remove the throttle position (TP) sensor connector (4).
  7. Rotate the throttle lever and disconnect the accelerator cable and the throttle valve cable, if equipped.
  8. Disconnect the electrical connector (5) of the idle air control (IAC) valve.
  9. Drain the cooling system. Refer to Cooling System Draining and Filling in Engine Cooling.
  10. Remove the 2 coolant hoses (3) from the throttle body.

  11. Object Number: 833114  Size: SH
  12. Remove the 2 throttle body nuts (3) and the accelerator control cable bracket (4).
  13. Remove the 2 throttle body bolts (5).
  14. Remove the throttle body (2) and the gasket (1) from the intake manifold.

  15. Object Number: 833107  Size: SH
  16. Clean any remaining throttle body gasket (1) from the intake manifold.

Installation Procedure


    Object Number: 833114  Size: SH
  1. Install a new throttle body gasket (1).
  2. Install the throttle body (2) onto the intake manifold with the 2 bolts (5).
  3. Install the accelerator cable bracket (4) and the 2 nuts (3) to the throttle body.
  4. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  5. Tighten the 4 throttle body fasteners.
  6. Tighten
    Tighten the fasteners to 22 N·m (16 lb ft).


    Object Number: 833112  Size: SH
  7. Connect the 2 coolant hoses (3) to the throttle body.
  8. Connect the PCV breather hose (6) to the throttle body (1).
  9. Connect the IAC valve electrical connector (5).
  10. Connect the TP sensor electrical connector (4).
  11. Install the air inlet duct (2).
  12. Refill the cooling system. Refer to Cooling System Draining and Filling in Engine Cooling.

  13. Object Number: 828878  Size: SH
  14. Install the engine cover (1) to the engine.
  15. Secure the engine cover (1) with the 4 fasteners.
  16. Tighten
    Tighten the fasteners to 7 N·m (62 lb in).