Callout | Component Name |
---|---|
Preliminary ProcedureRemove the secondary air injection check valve. Refer to Secondary Air Injection Check Valve Pipe Replacement | |
1 | Secondary Air Injection Pipe Bolt (Qty: 4) Caution: Refer to Fastener Caution in the Preface section. Tighten |
2 | Secondary Air Injection Pipe |