Cleaning and Inspection Procedure
- Inspect the front control valve body (306), for the following conditions:
• | Damaged machined surfaces |
- Clean all the valves, springs, bushings, and the front control valve body (306) in solvent.
- Dry all the parts using compressed air.
Installation Procedure
- Install the neutral relay valve (374) into the front control valve body (306).
- Install the neutral relay valve spring (375).
- Install the solenoid modulator valve bore plug (373) and the sleeve/bore plug retainer (372).
- Install the solenoid B-1 modulator valve no. 2 (370).
- Install the solenoid B-1 modulator valve no. 2 spring (371).
- Install the solenoid modulator valve bore plug (373) and the sleeve/bore plug retainer (372).