Caution: Refer to Vehicle Lifting Caution in the Preface section.
Important: Note the knock sensor 1 wire routing before removing the sensor.
Notice: Refer to Fastener Notice in the Preface section.
Tighten
Tighten the knock sensor bolt to 20 N·m
(15 lb ft).
Important: It may be easier to tighten the upper generator bolt when the vehicle is brought back to the ground.
Tighten
Tighten the generator mounting bolts to 40 N·m
(30 lb ft).
Install the generator charging post terminal (ORN wire) and the attachment nut.
Tighten
Tighten the B+ cable to the generator nut to 16 N·m
(12 lb ft).
Tighten
Tighten the generator L-terminal nut to 16 N·m
(12 lb ft).
Tighten
Tighten the belt tensioner bolts to 40 N·m
(30 lb ft).
Tighten
Tighten the generator mounting bolts to 40 N·m
(30 lb ft).
Tighten
Tighten the battery terminal bolts to 17 N·m
(13 lb ft).