GM Service Manual Online
For 1990-2009 cars only

Object Number: 1966474  Size: SH

Callout

Component Name

1

Roof Lift Off Panel

Procedure

  1. Place the roof panel on a protective surface.
  2. Transfer all necessary parts to the new roof panel.
  3. Ensure that the roof panel is in alignment with the both door windows and that the roof panel adjustment are made.
  4. Ensure the roof panel is fully latch before water test.