- Inspect and clean the O-ring groove and mating surfaces.
- Install the pins (302).
- Install the water pump (300) with NEW O-ring seal (303).
Notice: Refer to Fastener Notice in the Preface section.
- Install the bolts (301).
Tighten
Tighten the bolts to 12 N·m (106 lb in).