GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

  1. Remove the engine. Refer to Engine Replacement.
  2. Remove the right bank secondary timing chain. Refer to Secondary Camshaft Drive Chain Replacement - Right Side.

  3. Object Number: 902818  Size: SH
  4. Remove the cylinder head with the exhaust manifold. Refer to Cylinder Head Removal - Right Side.

  5. Object Number: 902817  Size: SH
  6. Remove and discard the cylinder head gasket.
  7. Clean and inspect the cylinder head and the engine block sealing surfaces. Refer to Cylinder Head Cleaning and Inspectionand Engine Block Cleaning and Inspection.
  8. If necessary, perform the following steps:
  9. • Remove the exhaust manifold from the cylinder head. Refer to Exhaust Manifold Removal - Right Side.
    • Remove the camshaft. Refer to Camshaft Removal - Right Side.
    • Disassemble the cylinder head. Refer to Cylinder Head Disassemble.

Installation Procedure

  1. If necessary, perform the following steps:
  2. • Assemble the cylinder head. Refer to Cylinder Head Assemble.
    • Install the camshaft. Refer to Camshaft Installation - Right Side.
    • Install the exhaust manifold to the cylinder head. Refer to Exhaust Manifold Installation - Right Side.

    Object Number: 902817  Size: SH
  3. Install a NEW cylinder head gasket.

  4. Object Number: 902818  Size: SH
  5. Carefully install the cylinder head with the exhaust manifold to the engine. Refer to Cylinder Head Installation - Right Side.
  6. Install the right bank secondary timing chain. Refer to Secondary Camshaft Drive Chain Replacement - Right Side.
  7. Install the engine. Refer to Engine Replacement.