3.1. | Drill through the rivets using a 8 mm (5/16 in) drill bit. |
3.2. | Enlarge the hole using a 12 mm (31/64 in) drill bit. |
3.3. | Remove any remaining burs from the control arm. |
Important: The control arm must be clean and free of debris.
Notice: Refer to Fastener Notice in the Preface section.
Important:
• Only use hardware provided with the new ball joint. • The bolts must be installed with the bolt head on top of the ball joint.
Tighten
Tighten the bolts and nuts to 68 N·m (50 lb ft).