Step | Action | Value(s) | Yes | No | ||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the Instrument Cluster Diagnostic System Check? | -- | Go to Step 2 | |||||||
2 |
Are all of the resistance measurements less than the specified value? | 5 ohms | Go to Step 4 | Go to Step 3 | ||||||
3 | Repair the open in CKT 351 (BLK/WHT) or CKT 150 (BLK). Did you complete the repair? | -- | -- | |||||||
4 | Measure the voltage from connector C1 terminal E14 and terminal F14 to ground. Do both measurements equal the specified value? | 10-15 V | Go to Step 6 | Go to Step 5 | ||||||
5 | Repair the open in CKT 40 (ORN). Did you complete the repair? | -- | -- | |||||||
6 |
Do both measurements equal the specified value? | 10-15 V | Go to Step 8 | Go to Step 7 | ||||||
7 | Repair the open or short to ground in CKT 39 (PNK) Did you complete the repair? | -- | -- | |||||||
8 | Inspect the instrument cluster connector C1 for proper terminal contact. Is the terminal contact OK? | -- | Go to Step 9 | Go to Step 10 | ||||||
9 | Replace the instrument cluster. Did you complete the repair? | -- | -- | |||||||
10 | Repair the poor terminal contact. Did you complete the repair? | -- | -- |
Step | Action | Value(s) | Yes | No | ||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the Instrument Cluster Diagnostic System Check? | -- | Go to Step 2 | |||||||
2 |
Are all of the resistance measurements less than the specified value? | 5 ohms | Go to Step 4 | Go to Step 3 | ||||||
3 | Repair the open in CKT 851 (BLK/WHT) or CKT 150 (BLK). Did you complete the repair? | -- | -- | |||||||
4 | Measure the voltage from connector C1 terminal D15 to ground. Does the voltage equal the specified value? | 10-15 V | Go to Step 6 | Go to Step 5 | ||||||
5 | Repair the open or short to ground in CKT 40 (ORN). Did you complete the repair? | -- | -- | |||||||
6 |
Is the measured voltage within the specified range? | 10-15 V | Go to Step 10 | Go to Step 7 | ||||||
7 | Repair the open or short to ground in CKT 439 (PNK) Did you complete the repair? | -- | -- | |||||||
8 | Inspect the instrument cluster connector C1 and connector C2 for proper terminal contact. Are the terminal contacts OK? | -- | Go to Step 9 | Go to Step 14 | ||||||
9 | Replace the instrument cluster. Did you complete the repair? | -- | -- | |||||||
10 |
Is the measured voltage within the specified range? | 10-15 V | Go to Step 12 | Go to Step 11 | ||||||
11 | Repair the open in CKT 41 (BRN). Did you complete the repair? | -- | -- | |||||||
12 |
Is the measured voltage within the specified range? | 10-15 V | Go to Step 8 | Go to Step 13 | ||||||
13 | Repair the open on CKT 39 (PNK). Did you complete the repair? | -- | -- | |||||||
14 | Repair the poor terminal contact. Did you complete the repair? | -- | -- |