Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Instrument Cluster Diagnostic System Check? | -- | Go to Step 2 | |
2 |
Is the voltage equal to the specified value? | 10-15 V | Go to Step 4 | Go to Step 3 |
3 | Repair the open or short to ground in CKT 40 (ORN). Did you complete the repair? | -- | -- | |
4 |
Does the voltage equal the specified value? | 10-15 V | Go to Step 6 | Go to Step 5 |
5 | Repair the open or short to ground in CKT 39 (PNK). Did you complete the repair? | -- | -- | |
6 | Inspect the remote indicator bank connector for proper terminal contact. Are the terminal contacts OK? | -- | Go to Step 7 | Go to Step 8 |
7 | Replace the remote indicator bank. Did you complete the repair? | -- | -- | |
8 | Repair the poor terminal contact. Did you complete the repair? | -- | -- |