Refrigerant Tubes Replacement High
Removal Procedure
Caution: Refer to Battery Disconnect Caution in the Preface section.
- Disconnect the negative battery cable.
- Remove the front bumper fascia. Refer to
Front Bumper Fascia Replacement
in Bumpers.
- Discharge and recover the refrigerant. Refer to
Refrigerant Recovery and Recharging
.
- Remove the bolt securing the high pressure pipe line to the compressor (1).
- Loosen the fitting
securing the high pressure pipe line to the condenser pipe line (1).
- Remove the clamp nut (2).
- Remove the A/C high pressure pipe line between the compressor and the
condenser.
- Loosen the fitting
securing the receiver dryer to the condenser (1).
- Remove the receiver
dryer flange nuts (1).
- Remove the A/C high pressure pipe line between the condenser and the receiver
dryer.
- Remove the purge
control valve. Refer to
Evaporative Emission Canister Purge Solenoid Valve Replacement
in Engine Controls-0.8L or
Evaporative Emission Canister Purge Solenoid Valve Replacement
in Engine Controls-1.0L.
- Remove the bracket nut (1).
- Loosen the fitting (2).
- Remove the A/C high pressure pipe line between the receiver dryer and
the evaporator.
Installation Procedure
Notice: Refer to Fastener Notice in the Preface section.
Important: Discard the removed O-rings.
- Install the high pressure pipe line (1) to the compressor.
Tighten
Tighten the bolt securing the high pressure pipe
line to the compressor to 23 N·m (17 lb ft).
- Install the fitting (1)
securing the high pressure pipe line to the receiver dryer.
Tighten
Tighten the fitting securing the high pressure pipe
line to the condenser pipe line to 23 N·m (17 lb ft).
- Install the fitting (3) securing the high pressure pipe line to
the receiver dryer.
Tighten
Tighten the fitting securing the high pressure pipe
line to the receiver dryer to 14 N·m (10.5 lb ft).
- Install the high pressure pipe line bracket and tighten the nut (2).
Tighten
Tighten the bracket nut to 5 N·m (44 lb in).
- Install the receiver
dryer flange and tighten the nuts (1).
Tighten
Tighten the receiver dryer flange nuts to 14 N·m
(10.5 lb ft).
- Install the high
pressure pipe line to the evaporator and tighten the nuts (2).
Tighten
Tighten the nut securing the high pressure pipe
line to the evaporator to 14 N·m (10.5 lb ft).
- Install the high pressure pipe line bracket and tighten the nut (1).
Tighten
Tighten the bracket nut to 5 N·m (44 lb in).
- Install the purge control valve. Refer to
Evaporative Emission Canister Purge Solenoid Valve Replacement
in
Engine Controls-0.8L and
Evaporative Emission Canister Vent Solenoid Valve Replacement
in Engine Controls-1.0L.
- Evacuate and recharge the system. Refer to
Refrigerant Recovery and Recharging
.
- Install the front bumper fascia. Refer to
Front Bumper Fascia Replacement
in Bumpers.
- Connect the negative battery cable.
Refrigerant Tubes Replacement Low
Removal Procedure
Caution: Refer to Battery Disconnect Caution in the Preface section.
- Disconnect the negative battery cable.
- Discharge and recover the refrigerant. Refer to
Refrigerant Recovery and Recharging
.
- Remove the bolt securing the A/C low pressure pipe line at the compressor (1).
- Remove the bracket
nut from the shut bar (1).
- Remove the purge
control valve. Refer to
Evaporative Emission Canister Purge Solenoid Valve Replacement
in Engine Controls-0.8L and
Evaporative Emission Canister Vent Solenoid Valve Replacement
in Engine Controls-1.0L.
- Loosen the nut securing the A/C low pressure pipe line at the evaporator (1).
- Remove the A/C low pressure pipe line.
Installation Procedure
Notice: Refer to Fastener Notice in the Preface section.
Important: Discard the removed O-rings.
- Install the A/C low pressure pipe line at the evaporator and tighten the nut (1).
Tighten
Tighten the nut securing the A/C low pressure pipe
line at the evaporator to 14 N·m (10.5 lb ft).
- Install bracket
nut (1) to the shut bar.
Tighten
Tighten the bracket nut to 5 N·m (44 lb in).
- Install the A/C
low pressure pipe line at the compressor and tighten the bolt (1).
Tighten
Tighten the bolt securing the A/C low pressure pipe
line at the compressor to 23 N·m (17 lb ft).
- Evacuate and recharge the system. Refer to
Refrigerant Recovery and Recharging
.
- Connect the negative battery cable.