Removal Procedure
- Remove the upper intake manifold. Refer to
Upper Intake Manifold Replacement
.
- Remove the fuel pipe clip bolt and the clip.
- Remove the fuel feed and the fuel return pipes from the fuel injector rail. Refer to
Fuel Injection Fuel Rail Assembly Replacement
in Engine Controls - 3.1L
- Remove the oil pump drive bolt.
- Remove the oil pump drive clamp.
- Remove the oil pump drive.
- Remove the oil pump drive seal.
Installation Procedure
- Install the oil pump drive seal. Coat the seal or bore in the engine block with engine oil.
- Coat the drive gear on the oil pump drive with prelube GM P/N 1052367 (Canadian P/N 992869) or the equivalent.
- Install the oil pump drive.
- Install the oil pump drive clamp.
Notice: Refer to Fastener Notice in the Preface section.
- Install the oil pump drive bolt.
Tighten
Tighten the bolt to 36 N·m (27 lb ft).
- Install the fuel feed and the fuel return pipes to the fuel injector rail. Refer to
Fuel Injection Fuel Rail Assembly Replacement
in Engine Controls - 3.1L
- Install the fuel pipe clip and the bolt.
Tighten
Tighten the bolt to 8 N·m (71 lb in).
- Install the upper intake manifold. Refer to
Upper Intake Manifold Replacement
.