Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics Connector End View Reference: Master Electrical Component List in Wiring Systems | |||
1 | Did you perform the Lighting System Diagnostic System Check? | Go to Step 2 | |
2 |
Did the headlamps operate properly? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 |
Does the scan tool display OFF status? | Go to Step 4 | Go to Step 12 |
4 |
Does the scan tool display OFF status? | Go to Step 5 | Go to Step 18 |
5 | With the scan tool, observe the Low Beam Output status in the DIM Outputs data list. Does the scan tool display OFF status? | Go to Step 6 | Go to Step 19 |
6 | Are the high beam headlamps on? | Go to Step 7 | Go to Step 8 |
7 | With the scan tool, observe the Flash to Pass Switch status in the DIM Inputs data list. Does the scan tool display OFF status? | Go to Step 10 | Go to Step 13 |
8 |
Did the low beam headlamps turn OFF? | Go to Step 9 | Go to Step 25 |
9 |
Did the test lamp illuminate? | Go to Step 14 | Go to Step 22 |
10 |
Did the high beam headlamps turn OFF? | Go to Step 11 | Go to Step 26 |
11 |
Did the test lamp illuminate? | Go to Step 15 | Go to Step 23 |
12 |
Does the scan tool display the OFF status? | Go to Step 21 | Go to Step 17 |
13 |
Does the scan tool display the OFF status? | Go to Step 20 | Go to Step 16 |
14 | Test for a short to ground in the headlamp low beam relay control circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 19 |
15 | Test for a short to ground in the headlamp high beam relay control circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 19 |
16 | Test for a short to ground in the flash to pass switch signal circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 19 |
17 | Test the headlamp switch headlamps on signal circuit for a short to ground. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 19 |
18 | Test for a short to battery positive voltage in the windshield wiper switch on signal circuit of the DIM. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 19 |
19 | Test for a short to ground in the headlamp relay control circuit of the DIM. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 24 |
20 | Inspect for poor connections at the harness connector of the turn sign/multifunction switch. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 28 |
21 | Inspect for poor connections at the harness connector of the headlamp switch. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 27 |
22 | Inspect for poor connections at the HDLP LO BM relay. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 29 |
23 | Inspect for poor connections at the HDLP HI BM relay. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 30 |
24 | Inspect for poor connections at the harness connector of the DIM. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 32 | Go to Step 31 |
25 | Repair the short to battery positive voltage in the headlamp low beam supply voltage circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 32 | -- |
26 | Repair the short to battery positive voltage in the headlamp high beam supply voltage circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 32 | -- |
27 | Replace the headlamp switch assembly. Refer to Headlamp Switch Replacement . Did you complete the replacement? | Go to Step 32 | -- |
28 | Replace the turn signal/multifunction switch. Refer to Turn Signal Multifunction Switch Replacement in Steering Wheel and Column. Did you complete the replacement? | Go to Step 32 | -- |
29 | Replace the HDLP LO BM relay. Refer to Relay Replacement in Wiring Systems. Did you complete the replacement? | Go to Step 32 | -- |
30 | Replace the HDLP HI BM relay. Refer to Relay Replacement in Wiring Systems. Did you complete the replacement? | Go to Step 32 | -- |
31 |
Important:: After replacement perform the setup procedure for the DIM. Refer to Body Control Module (BCM) Programming/RPO Configuration in Body Control System. Replace the DIM. Refer to Dash Integration Module Replacement in Body Control System. Did you complete the replacement? | Go to Step 32 | -- |
32 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |