Callout | Component Name |
---|---|
Preliminary Procedure
| |
1 | TXV Pass Through Seal |
2 | Heater and A/C Pipe Screw (Qty: 3) Caution: Refer to Fastener Caution in the Preface section. Tighten |
3 | Heater and A/C Pipe Cover |
4 | Heater Core Tube Clamp Screw Tighten |
5 | Heater Core Tube Clamp |
6 | Heater Core |