Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Instrument Cluster Diagnostic System Check? | -- | Go to Step 2 | |
2 |
Is the measured voltage within the specified range? | 10-15 V | Go to Step 8 | Go to Step 3 |
3 | Inspect CKT 745 (GRY/BLK) for an open or short to ground. Is the wiring OK? | -- | Go to Step 5 | Go to Step 4 |
4 | Repair the open or short to ground on CKT 745 (GRY/BLK). Did you complete the repair? | -- | -- | |
5 | Inspect instrument cluster connector C2 and terminal B9 for proper terminal contact. Are the terminal contacts OK? | -- | Go to Step 7 | Go to Step 6 |
6 | Repair the poor terminal contact. Did you complete the repair? | -- | -- | |
7 | Replace the instrument cluster. Refer to Instrument Cluster Replacement. Did you complete the repair? | -- | -- | |
8 | Use a J 39200 DMM in order to measure the voltage between the left front door latch assembly connector terminal B (GRY/BLK) and connector terminal D (BLK/WHT). Is the voltage within the specified range? | 10-15 V | Go to Step 11 | Go to Step 9 |
9 | Inspect CKT 151 (BLK/WHT) for an open. Is the wiring OK? | -- | Go to Step 10 | |
10 | Repair the open in CKT 151 (BLK/WHT). Did you complete the repair? | -- | -- | |
11 | Inspect the left front door latch for proper terminal contact. Is the terminal contact OK? | -- | Go to Step 12 | Go to Step 6 |
12 | Replace the left door latch assembly. Did you complete the repair? | -- | -- |