Instrument Cluster Replacement LHD
Removal Procedure
- Remove the IP upper trim
pad. Refer to
Instrument Panel Upper Trim Pad Replacement
.
- Remove the instrument cluster trim panel. Refer to
Instrument Cluster Trim Panel Replacement
.
- Remove four fasteners (3) from the IP cluster to IP retainer.
- Remove electrical connectors (1) on each side of the IP cluster.
- IP cluster (2) from retainer.
Installation Procedure
- Set IP cluster (2) partially
into retainer.
- Connect the electrical connectors (1).
- Align IP cluster to retainer.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the four
fasteners (3).
Tighten
Tighten the cluster fasteners to 1.5 N·m (14 lb in).
- Install the IP cluster trim panel. Refer to
Instrument Cluster Trim Panel Replacement
.
- Install the IP upper trim pad. Refer to
Instrument Panel Upper Trim Pad Replacement
.