Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the entire Exterior Lights System Check performed? | -- | ||
2 |
Is the voltage within the specified range? | 10-15 V | ||
3 | Replace the turn signal switch. Refer to Turn Signal and Multifunction Switch Assembly - Off Vehicle in Steering Wheel and Column-Tilt. Is the turn signal switch replacement complete? | -- | -- | |
4 | Check the rear junction block IGN 1 Fuse for an open. Is the IGN 1 Fuse OK? | -- | ||
5 | Repair the short to ground in CKT 1039 (PNK). Check all wiring that is fed by the IGN 1 Fuse. Refer to Wiring Repairs in Wiring Systems. Is the circuit repair complete? | -- | -- | |
6 | Replace the IGN 1 Fuse. Refer to Wiring Repairs in Wiring Systems. Is the IGN 1 Fuse replacement complete? | -- | -- | |
7 | Repair the open in CKT 1039 (PNK) between the rear junction block and the turn signal switch. Refer to Wiring Repairs in Wiring Systems. Is the circuit repair complete? | -- | -- |