- Install the IP carrier
to the vehicle.
- Route the harness headlamp branch through the IP opening.
- Connect the harness rosebud (2) to the IP.
- Place the main wire harness over the retaining clips (1)
on the back of the IP carrier.
- Connect the IP cluster connector to the IP carrier.
- Route the harness branches
through the IP openings.
- Connect the theft deterrent relay (4) to the SIR bracket.
- Connect the convertible top motor relay (3), if equipped
to the SIR bracket.
- Connect the harness rosebuds (1,2) to the IP.
- Connect the rosebud connectors (3)
to the IP tie bar.
- Connect the convertible top relay (2), if equipped to the
SIR bracket.
- Connect the rear fog lamp relay (1), if equipped to the
SIR bracket.
- Clip the A/C resistor
connector to the IP.
- Connect the IP harness to the A/C resistor connector.
- Connect the blower motor
relay to the IP.
- Connect the hatch release
relay to the IP.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the 48-way connector
and bolts to the IP.
Tighten
Tighten the bolts to 1.5 N·m (11 lb in).
- Install the hazard flasher
to the IP tie bar.
- Route the cross car harness (2)
and forward lamp harness (1) over the hook.
- Align the air distribution
duct to the IP carrier.
- Install the bolt for the air distribution duct to the IP carrier.
Tighten
Tighten the bolts to 2.2 N·m (19 lb in).
- Align the IP carrier to
the dash, with the outboard slots in the IP tie bar over the studs on the
IP mounting brackets at the front body hinge pillar inner panel.
- Press the IP forward and engage the slots in the tie bar onto
the studs on the steering column mounting bracket.
- Align the holes in the IP carrier and the passenger side SIR bracket
to the J-nuts on the dash.
- Install the IP carrier mounting bolts (1).
Tighten
Tighten the bolts to 2 N·m (18 lb in).
- Align the cross car and the IP harness ground to the appropriate
IP mounting studs.
- Install the IP carrier mounting nuts (2).
Tighten
Tighten the nuts to 2.5 N·m (22 lb in).
- Install the hinge pillar trim. Refer to
Body Hinge Pillar Trim Panel Replacement
.
- Align the data link connector
to the tie bar (1).
- Install the data link connector bolts (2).
Tighten
Tighten the bolts to 2 N·m (18 lb in).
- Install the turn signal
flasher (2) to the IP tie bar.
- Clip the star connector
to the knee bolster bracket.
- Install a tie strap securing the steering column harness branch
to the air distributor duct.
- Install upper tabs on
the fuse block into the IP carrier.
- Install the fuse block mounting bolt.
Tighten
Tighten the bolt to 1.5 N·m (13 lb in).
- Install the front floor console. Refer to
Front Floor Console Replacement
.
- Connect the DRL module
electrical connectors.
- Install the DRL module
to the HVAC duct.
- Pull the harness through
the IP opening.
- Install the retainer (1) to the switch (2).
- Snap the retainer (1) to the IP.
- Install the IP cluster. Refer to
Instrument Cluster Replacement
.
- Connect the electrical connectors and antenna cable to the radio.
- Install the radio to the radio bracket and install the radio bolts.
Tighten
Tighten the bolts to 1.8 N·m (16 lb in).
- Install the HVAC control. Refer to
Heater and Air Conditioning Control Replacement
in HVAC Systems - Manual.
- Enable the SIR system. Refer to
Enabling the SIR System
in SIR.
- Install the IP storage compartment door. Refer to
Instrument Panel Compartment Door Replacement
.
- Install the IP upper trim pad. Refer to
Instrument Panel Upper Trim Pad Replacement
.