Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Is the Volts or Check Gauge indicator ON? | -- | ||
2 |
Is continuity present? | -- | ||
3 | Install a fused jumper wire from the ground to the instrument connector C1 (Chev) or C2 (Buick) CKT25 (leave the cluster connected). Is the Volts or Check Gauge indicator ON? | -- | ||
4 | Using a DVM to ground, check for B+ at the instrument cluster connector C2 terminal A11 (CHecv) or A9 (Buick). Is B+ present? | -- | ||
5 |
Is the repair complete? | -- | System OK | -- |
6 |
Is the repair complete? | -- | System OK | -- |
7 | Repair the open in CKT25 from connector C205 to terminal L of the generator connection. Is the repair complete? | -- | System OK | -- |
8 | Repair the open in CKT25 from instrument cluster to connector C205. Is the repair complete? | -- | System OK | -- |
9 |
Is the repair complete? | -- | System OK | -- |