Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics | |||
1 | Did you review the Lighting System Description and Operation and perform the necessary inspections? | Go to Step 2 | |
2 | Verify that the daytime running lamps are on with the park brake applied. Does the system operate normally? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 |
Is a high resistance condition present? | Go to Step 4 | Go to Step 5 |
4 | Replace the DRL control module. Refer to Daytime Running Lights (DRL) Control Module Replacement . Is the replacement complete? | Go to Step 8 | -- |
5 |
Is an open condition present? | Go to Step 7 | Go to Step 6 |
6 | Locate and repair the open in the DRL relay control circuit between the brake switch connector and the DRL control module. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | Go to Step 8 | -- |
7 | Replace the parking brake switch. Refer to Parking Brake Indicator Switch Replacement in Park Brake. Is the replacement complete? | Go to Step 8 | -- |
8 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 3 |