Intake Manifold Replacement Lower
Removal Procedure
- Mark the relationship of the distributor housing and rotor for
proper reassembly.
- Remove the distributor. Refer to Distributor Replacement in Engine
Electrical.
- Remove the upper radiator hose at the thermostat housing. Refer
to Radiator Hose Replacement in Engine Cooling.
- Remove the heater hose at the lower intake manifold. Refer to
Heater Hose Replacement in Heater, Ventilation, and Air Conditioning.
- Remove the EGR valve. Refer to
Exhaust Gas Recirculation Valve Replacement
in Engine Controls.
- Remove the valve rocker arm cover. Refer to
Valve Rocker Arm Cover Replacement
.
- Remove the coolant bypass hose. Refer to Bypass Hose Replacement
in Engine Cooling.
- Remove the fuel supply and return lines at the rear of the lower
intake manifold. Refer to
Fuel Hose and Pipes
in Engine Controls.
- Remove the wiring harness and brackets.
- Remove the throttle cable and bracket.
- Remove the cruise control cable (if equipped).
- Remove the transmission oil level indicator tube, (if equipped).
Refer to Transmission.
- Remove the EGR inlet tube, clamp, and bolt.
- Remove the PCV valve and vacuum hoses.
- Remove the air conditioning compressor. Refer to Compressor in
Heater, Ventilation, and Air Conditioning.
• | Loosen the A/C compressor mounting bracket and slide forward,
do not remove. |
• | Lay the A/C compressor out of the way. Do not kink the air conditioning
lines. |
- Remove the power brake vacuum tube.
- Remove the generator rear bracket bolt, (if needed).
- Remove the lower intake
manifold.
- Remove the old pieces of gasket from the gasket surfaces.
- Remove excessive carbon buildup from inside the exhaust passages.
- Remove the scale and deposits from the coolant passages.
- Clean the EGR passage of excessive carbon deposits.
- Inspect the manifold for cracks, broken flanges, and gasket surface
damage.
Installation Procedure
- Install the gaskets to the cylinder head with the port blocking
plates facing the rear of the engine and This Side Up stamping facing up.
- Install RTV to the front and the rear sealing surfaces on the block.
Apply a 5 mm (3/16 in) bead of RTV GM P/N 1052366 or equivalent
to the front and the rear of the block. Extend the bead 13 mm (1/2 in)
up each cylinder head to seal and retain the gaskets.
- Install the lower intake manifold to the engine. Apply sealer, GM P/N
1052080 or equivalent, to the lower intake manifold bolts.
- Install the lower intake manifold bolts. Tighten the bolts in three
steps:
Tighten
- Tighten the bolts on the first sequence to 8 N·m
(71 lb in).
- Tighten the bolts on the second sequence to 12 N·m
(106 lb in).
- Tighten the bolts on the final sequence to 15 N·m
(11 lb ft).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the wiring harness connectors and brackets.
- Install the upper radiator hose at the thermostat housing. Refer
to Radiator Hose Replacement in Engine Cooling.
- Install the heater hose at the lower intake manifold. Refer to
Heater Hose Replacement in Engine Cooling.
- Install the coolant bypass hose. Refer to Bypass Hose Replacement
in Heater, Ventilation, and Air Conditioning.
- Install the EGR valve. Refer to
Exhaust Gas Recirculation Valve Replacement
in Engine Controls.
- Install the valve rocker arm cover. Refer to
Valve Rocker Arm Cover Replacement
.
- Install the fuel supply and return lines at the rear of the lower
intake manifold. Refer to
Fuel Hose and Pipes
in Engine Controls.
- Install the wiring harness and brackets.
- Install the cruise control cable (if equipped).
- Install the throttle cable and bracket. Refer to Accelerator Controls (Accelerator Control Cable)
in Engine Controls.
- Install the transmission oil level indicator tube. Refer to Transmission.
- Install the EGR inlet tube, clamp, and bolt.
- Install the PCV valve and vacuum hoses.
- Install the power brake vacuum tube.
- Install the generator and the bracket bolt, (if needed).
- Install the air conditioning compressor and bracket. Refer to
Heater, Ventilation, and Air Conditioning.
- Install the distributor. Note the relationship of the distributor
housing and rotor made at disassembly. Refer to Distributor Replacement in
Engine Electrical.
Intake Manifold Replacement Upper
Removal Procedure
- Disconnect the battery negative cable assembly from
the battery negative terminal. Refer to
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing
any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to
the vehicle or its components.
Battery Disconnect Caution in General Information.
- Remove the air cleaner assembly. Refer to Air Cleaner (Assembly)
in Engine Controls.
- Remove the wiring harness connectors and
the brackets and move aside.
- Remove the throttle cable and the bracket from the upper intake
manifold.
- Remove the cruise control cable, (if equipped).
- Remove the fuel lines from the intake to the rear of the block.
Refer to
Fuel Hose and Pipes
Fuel Hose and Pipes (Engine
Fuel Pipes) in Engine Controls.
- Remove the ignition coil and the bracket. Refer to Ignition Coil
Replacement in Engine Electrical.
- Remove the upper intake manifold. Refer to Intake Manifold Removal
Installation Procedure
- Install the upper intake manifold gasket.
- Install the upper intake manifold. Use care not to pinch the injector
lines between the upper and lower intake manifolds.
- Install the upper intake manifold bolts. Note the marks made at
disassembly for proper stud location. Install the two corner studs first in
order to help align the two halves.
- Tighten the bolts in two steps:
Tighten
- Tighten the bolts on the first sequence to 5 N·m
(45 lb in).
- Tighten the bolts on the final sequence to 10 N·m
(83 lb in).
- Install the purge solenoid and bracket. Refer to
Evaporative Emission Vacuum Switch
EVAP Vacuum Switch in Engine Controls.
- Install the ignition coil and bracket. Refer to Ignition Coil
Replacement in Engine Electrical.
- Install the PCV hose at the upper intake manifold.
- Install the fuel lines from the intake at the rear of the block.
Refer to
Fuel Hose and Pipes
Fuel Hose and Pipes (Engine
Fuel Pipes) in Engine Controls.
- Install the cruise control cable (if equipped).
- Install the throttle cable and bracket from the upper intake manifold.
Refer to Accelerator Controls (Accelerator Control Cable)
In Engine Controls.
- Install the wiring harness connectors and brackets.
- Install the air cleaner assembly. Refer to Air Cleaner (Assembly)
in Engine Controls.
- Connect the battery negative cable assembly to the battery negative
terminal.
Tighten
Tighten the bolt to 15 N·m (11 lb ft).