Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Does the generator voltage measure at or near the specified value? | 7.5 V | Go to Step 2 | Go to Charging System Check in Engine Electrical |
2 |
Does the test lamp illuminate? | -- | Go to Step 3 | Go to Step 6 |
3 | With the test lamp connected at the same location from the previous step, disconnect the MFAM. Does the test lamp still illuminate? | Go to Step 4 | Go to Step 9 | |
4 | With the test lamp connected at the same location from the previous step, disconnect the hourmeter. Does the test light still illuminate? | Go to Step 5 | Go to Step 10 | |
5 | Test CKT 53 (YEL) for a short to ground between the instrument cluster terminal 33 and C200. Refer to Testing for Short to Ground in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 7 |
6 | Test for continuity between the instrument cluster terminal 33 CKT 53 (YEL) and C200. Refer to Testing for Continuity in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 7 |
7 | Test for continuity or for a short to ground between the generator terminal R CKT 1477 (PPL) and C200. Refer to Testing for Continuity and to Testing for Short to Ground in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 8 |
8 | Replace the IP cluster. Refer to Instrument Cluster Replacement . Did you complete the replacement? | -- | Go to Step 11 | -- |
9 | Replace MFAM. Refer to Multifunction Alarm Module Replacement Did you complete the replacement? | -- | Go to Step 11 | -- |
10 | Replace Hourmeter. Refer to Engine Hour Meter Replacement Did you complete the replacement? | -- | Go to Step 11 | -- |
11 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | -- |