GM Service Manual Online
For 1990-2009 cars only

Auxiliary Generator Replacement 6.6L (LB7) Engine

Removal Procedure


    Object Number: 674573  Size: SH
  1. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  2. Remove the drive belt. Refer to Drive Belt Replacement in Engine Mechanical - 6.6L.
  3. Disconnect the auxiliary generator electrical connector (4).

  4. Object Number: 700660  Size: SH
  5. Remove the auxiliary generator bolts.
  6. Remove the auxiliary generator.

  7. Object Number: 395686  Size: SH
  8. Remove the generator cable from the auxiliary generator, perform the following:
  9. 6.1. Slide the boot down revealing the terminal stud.
    6.2. Remove the generator cable nut from the terminal stud.
    6.3. Remove the generator cable.

    Object Number: 700661  Size: SH
  10. If required, remove the auxiliary generator bracket bolt.
  11. Remove the auxiliary generator bracket.

Installation Procedure


    Object Number: 700661  Size: SH
  1. If removed, install the auxiliary generator bracket.
  2. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  3. Install the auxiliary generator bracket bolt.
  4. Tighten
    Tighten the bolt to 50 N·m (37 lb ft).


    Object Number: 395686  Size: SH
  5. Install the generator cable to the auxiliary generator, perform the following:
  6. 3.1. Install the generator cable.
    3.2. Install the generator cable nut to the terminal stud.

    Tighten
    Tighten the nut to 9 N·m (80 lb in).

    3.3. Slide the boot over the terminal stud.

    Object Number: 700660  Size: SH
  7. Install the auxiliary generator.
  8. Install the auxiliary generator bolts.
  9. Tighten
    Tighten the bolts to 50 N·m (37 lb ft).


    Object Number: 674573  Size: SH
  10. Connect the auxiliary generator electrical connector (4).
  11. Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical - 6.6L.
  12. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .

Auxiliary Generator Replacement 6.6L (LLY) Engine

Removal Procedure

Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.


    Object Number: 1369550  Size: SH
  1. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  2. Disconnect the auxiliary generator electrical connector (3).
  3. Remove the drive belt. Refer to Drive Belt Replacement .

  4. Object Number: 1369548  Size: SH
  5. Remove the positive cable from the auxiliary generator. Perform the following:
  6. 4.1. Slide the boot (4) down to access the terminal stud.
    4.2. Remove the positive cable nut (1).
    4.3. Remove the positive cable.

    Object Number: 1369547  Size: SH
  7. Remove the auxiliary generator bolts (3).
  8. Remove the auxiliary generator (4).

Installation Procedure

    Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1369547  Size: SH
  1. Install the auxiliary generator (4).
  2. Install the auxiliary generator bolts (3).
  3. Tighten
    Tighten the bolts to 50 N·m (37 lb ft).


    Object Number: 1369548  Size: SH
  4. Install the positive cable to the auxiliary generator, perform the following:
  5. 3.1. Install the positive cable.
    3.2. Install the positive cable nut (1).

    Tighten
    Tighten the nut to 9 N·m (80 lb in).

    3.3. Slide the boot (4) up to cover the terminal stud.
  6. Install the drive belt. Refer to Drive Belt Replacement .

  7. Object Number: 1369550  Size: SH
  8. Connect the auxiliary generator electrical connector (3).
  9. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .