Callout | Component Name | ||||
---|---|---|---|---|---|
Preliminary Procedure
| |||||
1 | Intermediate Side Door Check Link ProcedureUnder hook the check link from the center pillar. | ||||
2 | Intermediate Side Door Upper Hinge Pin Procedure
Special Tools
| ||||
3 | Intermediate Side Door Lower Hinge Pin ProcedureFollow the upper pin removal | ||||
4 | Intermediate Side Door Assembly ProcedureWhen replacing the door it is necessary to transfer all the internal components. |