Removal Procedure
- Disconnect negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
Important: After removing the outlet duct, cover the turbocharger (TC) openings with tape in order to prevent entry of objects.
- Remove the air cleaner . Refer to
Air Cleaner Replacement
.
- Remove the charged air pipe. Refer to
Charged Air Cooler Hoses/Pipes Replacement
.
- Remove the glow plug control module. Refer to
Glow Plug Control Module Replacement
.
- Drain the cooling system. Refer to
Cooling System Draining and Filling
.
- Remove the fan. Refer to
Fan Replacement
.
- Disconnect the A/C compressor clutch electrical connector.
- Disconnect the A/C cut out switch electrical connector.
- Remove the A/C compressor bolts.
- Reposition the A/C compressor (with the hoses attached) to the right side of the engine compartment.
- Remove the A/C compressor/power steering pump mounting bracket. Refer to
Air Conditioning Compressor Replacement
.
- Remove the oil fill tube. Refer to
Oil Filler Tube Replacement
.
- Remove the heater outlet hose bolt from the generator bracket.
- Remove the drive belt tensioner bolt and tensioner.
- Remove the generator. Refer to
Generator Replacement
.
- Remove the generator bracket bolts and bracket.
- Remove the thermostat housing crossover. Refer to
Thermostat Housing Crossover Replacement
.
- Remove the air intake pipe. Refer to
Air Intake Pipe Replacement
.
- Disconnect the fuel balance pipe fitting from the right fuel rail.
- Remove the fuel balance pipe retainer bolts.
- Disconnect the fuel rail inlet pipe from the injection pump and rail.
- Remove the inlet pipe.
- Remove the center intake manifold. Refer to
Center Intake Manifold Replacement
.
- Reposition the injection pump hose clamps at the fuel line.
- Remove the hoses from fuel lines.
- Remove the fuel injection pump bolts.
Important: Be careful not to damage any mating surfaces.
- Remove the fuel injection pump from the block.
Use 2 screwdrivers to work the pump from the block towards the rear of engine keeping the pump straight.
- The fuel injection pump may need to be rotated in order to remove it from the vehicle.
Fuel Injection Pump Preparation Procedure
- Hold the fuel pump by the drive gear in a vice with copper jaw liners.
- Loosen the gear nut until the nut is even with the end of the gear shaft.
- Remove the gear from the tapered shaft of the injection pump.
- Separate the injection pump and adapter by removing the 3 bolts and spacers.
- Inspect the O-ring for damage on the pump adapter and replace, if necessary. Lubricate the O-ring with clean engine oil.
- Clean all mating surfaces.
Notice: Refer to Fastener Notice in the Preface section.
- Install the adapter on the pump.
- Install the 3 bolts and spacers.
Tighten
Tighten the bolts to 20 N·m (15 lb ft).
- Install the gear and nut.
Tighten
Tighten nut to 70 N·m (52 lb ft).
Installation Procedure
- Install the fuel injection pump to the block.
- Install the fuel injection pump bolts.
Tighten
Tighten the bolts to 21 N·m (15 lb ft).
- Install the hoses to fuel lines.
- Position the injection pump hose clamps at the fuel line.
- Install the center intake manifold. Refer to
Center Intake Manifold Replacement
.
- Install the inlet pipe.
- Connect the fuel rail inlet pipe to the injection pump and rail.
Tighten
Tighten the fittings to 41 N·m (30 lb ft).
- Connect the fuel balance pipe fitting to the right fuel rail.
Tighten
Tighten the fitting to 41 N·m (30 lb ft).
- Install the fuel balance pipe retainer bolts.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the air intake pipe. Refer to
Air Intake Pipe Replacement
.
- Install the thermostat housing crossover. Refer to
Thermostat Housing Crossover Replacement
.
- Install the generator bracket and bolts.
Tighten
Tighten the bolts to 46 N·m (34 lb ft).
- Install the generator. Refer to
Generator Replacement
.
- Install the drive belt tensioner and bolt.
Tighten
Tighten the bolt to 50 N·m (37 lb ft).
- Install the heater outlet hose bolt to the generator bracket.
Tighten
Tighten the bolt to 21 N·m (15 lb ft).
- Install the oil fill tube. Refer to
Oil Filler Tube Replacement
.
- Install the A/C compressor/power steering pump mounting bracket. Refer to
Air Conditioning Compressor Replacement
.
- Position the A/C compressor, with the hoses attached, to the bracket.
- Install the A/C compressor bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Connect the A/C cut out switch electrical connector.
- Connect the A/C compressor clutch electrical connector.
- Install the fan. Refer to
Fan Replacement
.
- Install the glow plug control module. Refer to
Glow Plug Control Module Replacement
.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
.
- Install the charged air pipe. Refer to
Charged Air Cooler Hoses/Pipes Replacement
.
- Connect negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Install the air cleaner . Refer to
Air Cleaner Replacement
.
- Prime the fuel system. Refer to
Fuel System Priming
.
- Start the engine. If the engine stalls, repeat the above step.
- Once the engine starts, inspect for fuel leaks.