Removal Procedure
- Remove the instrument panel. Refer to
Instrument Panel Carrier Replacement
in Instrument Panel, Gages, and Console.
- Remove both of the heater cores. Refer to
Heater Core Replacement
.
- Remove the evaporator. Refer to
Air Conditioning Evaporator Core Replacement
.
- Remove the relay panel mounting screws and move the panel out
of the way.
- Disconnect the following electrical connectors:
• | The blower motor electrical connector |
• | The recirculation actuator electrical connector |
• | The mode actuator electrical connector |
• | The flasher module electrical connector |
• | The blower motor resistor electrical connector |
- Remove the passenger compartment
air filter.
- Remove the right heater module nuts.
- Remove the right heater module from the front cowl.
- Remove the relay center number 2 mounting bracket screws and move
out of the way.
- Remove the left side floor duct support screw from the left side
of the heater module.
- Disconnect the air temperature actuator connector.
- Disconnect the instrument panel harness retainer from the bottom
of the left heater module.
- Remove the left heater module nuts, screws, and washers.
- Remove the left heater module.
Installation Procedure
- Install the left heater
module.
- Install the left heater module nuts, screws, and washers.
- Connect the instrument panel harness retainer to the bottom of
the left heater module.
- Connect the evaporator temperature actuator connector.
- Install the left side floor duct support screw to the left side
of the heater module.
- Install the relay center number 2 mounting bracket screws.
- Install the right heater module to the front cowl.
- Install the right heater module nuts.
- Install the passenger compartment air filter.
- Connect the following electrical connectors:
• | The blower motor electrical connector |
• | The recirculation actuator electrical connector |
• | The mode actuator electrical connector |
• | The flasher module electrical connector |
• | The blower motor resistor electrical connector |
- Position the relay panel and install the mounting screws.
- Install the evaporator. Refer to
Air Conditioning Evaporator Core Replacement
.
- Install both of the heater cores. Refer to
Heater Core Replacement
.
- Install the instrument panel. Refer to
Instrument Panel Carrier Replacement
in Instrument Panel, Gages, and Console.