Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Did the test lamp light? | -- | Go to Step 2 | Go to Step 3 |
2 | Connect a J39200 between CKT 22 (BLK) at the instrument cluster connector terminal C15 and ground. Does the DMM indicate continuity? | Go to Step 5 | Go to Step 4 | |
3 | Locate and repair the open in CKT 21 (BRN) between the IP fuse block circuit breaker #6 and the instrument cluster connector. Is the repair complete? | -- | System OK | -- |
4 | Locate and repair the open in CKT 22 (BLK) between the instrument cluster and joint connector 1, terminal 3F. Is the repair complete? | -- | System OK | -- |
5 | Replace the instrument cluster. Refer to Instrument Cluster Replacement . Is the repair complete? | -- | System OK | -- |