Step | Action | Value(s) | Yes | No | ||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the Power Door Locks System Check? | -- | Go to Step 2 | |||||||
2 |
Does the MALL module sound 1 bong for the PARK to NEUTRAL shift and 1 bong for the NEUTRAL to PARK shift? | -- | Go to Step 3 | Go to Step 4 | ||||||
3 | Set the automatic door locks to operate in mode 3. Refer to Automatic Door Lock System Description . Does the automatic door locks feature work once this procedure is complete? | -- | Go to Step 4 | |||||||
4 |
Does the voltage measure within the specified range? | 10-15 V | Go to Step 13 | Go to Step 5 | ||||||
5 |
Does the voltage measure within the specified range? | 10-15 V | Go to Step 10 | Go to Step 6 | ||||||
6 | Inspect fuse T/SIG/BULB/BTSI in the IP fuse block. Is the fuse open? | -- | Go to Step 7 | Go to Step 9 | ||||||
7 | Measure the voltage from the PARK/NEUTRAL position switch connector C1 terminal B to terminal B+. Does the voltage measure within the specified range? | 10-15 V | Go to Step 8 | Go to Step 14 | ||||||
8 | Repair the short to ground on CKT 539 (PNK). Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||||
9 | Repair the open in CKT 539 (PNK) or the open power feed to fuse 1B in the IP fuse block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||||
10 | Test CKT 275 (LT GRN) for an open or short to ground. Refer to Wiring Repairs in Wiring Systems. Is CKT 275 OK? | -- | Go to Step 12 | Go to Step 11 | ||||||
11 | Repair CKT 275 (LT GRN). Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||||
12 | Replace the park/neutral position switch. Refer to Park/Neutral Position Switch Replacement in Transmission/Transaxle. Is the replacement complete? | -- | -- | |||||||
13 |
Does the voltage measure within the specified range? | 10-15 V | Go to Step 14 | Go to Step 17 | ||||||
14 | Test CKT 275 (LT GRN) for a short to the battery. Is CKT 275 OK? | -- | Go to Step 16 | Go to Step 15 | ||||||
15 | Repair the CKT 275 (LT GRN). Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||||
16 | Replace the park/neutral position switch. Refer to Park/Neutral Position Switch Replacement in Transmission/Transaxle. Is the repair complete? | -- | -- | |||||||
17 | Inspect the MALL module for proper terminal contact at the connector C2 terminal D6. Refer to Intermittents and Poor Connections Diagnosis in Wiring Systems. Is the terminal contact at the connector OK? | -- | Go to Step 19 | Go to Step 18 | ||||||
18 | Repair the MALL module connector C2 terminal contact. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||||
19 | Replace the MALL module. Refer to Body Control Module Replacement in Body Control System. Is the repair complete? | -- | -- |