Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Heater Core brackets |
2 | Heater Core ProcedurePull out the heater core. |
3 | Heater and Blower and Air Conditioning Control Module |
4 | A/C Evaporator Thermal Expansion Valve Fastener (Qty: 2) Caution: Refer to Fastener Caution in the Preface section. Tighten |
5 | Air Conditioning Evaporator Thermal Expansion Valve ProcedureRemove and discard sealing washers. Refer to Sealing Washer Replacement. |
6 | Heater and Air Conditioning Evaporator and Blower Module Case Screw (Qty: 11) |
7 | Heater and Air Conditioning Evaporator and Blower Module Lower Case |
8 | Air Conditioning Evaporator Core |