The folding top uses electronically controlled valves to control the flow of hydraulic fluid. The Folding Top Control (FTC) Module controls Valve 2 (V2) by supplying voltage to the valve. The FTC Module also monitors the control circuit of V2 for proper operation.
The Folding Top Control (FTC) module is activel.
A short to voltage on the control circuit of V2.
A short to ground on the control circuit of V2.
An open on the control circuit or low reference circuit of V2.
The top is disabled.
The fault is no longer present and the top completes one cycle.
Power Roof Systems Connector End Views
Power Folding Top Description and Operation
Test the control circuit of V2 for a short to voltage. If circuit OK, replace FTC Module.
Test the control circuit of V2 for a short to ground. If circuit OK, replace FTC Module.
⇒ | If the test lamp does not illuminate, test the control circuit for an open or high resistance. |
⇒ | If circuit OK, replace FTC Module. |
⇒ | If the test lamp does not illuminate, test the low reference circuit for an open or high resistance. |
⇒ | If circuit OK, replace FTC Module. |
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.