Step | Action | Yes | No | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DEFINITION: Noise originating from the HVAC module. | |||||||||||||||
1 | Were you sent here from Symptoms or another diagnostic table? | Go to Step 2 | |||||||||||||
2 |
Is a scrape or pop noise evident when selecting modes or temperature settings? | Go to Step 6 | Go to Step 3 | ||||||||||||
3 | Is a tick/click, chirping, groaning or scraping noise present, but decreases as blower motor speed is decreased? | Go to Step 6 | Go to Step 4 | ||||||||||||
4 | Is an air rush/whistle noise evident in all modes but not all temperature settings? | Go to Step 6 | Go to Step 5 | ||||||||||||
5 | Is an air rush/whistle noise evident only in defrost or floor mode? | Go to Step 6 | Go to Step 6 | ||||||||||||
6 | Remove the instrument panel (I/P) tie bar. Refer to Instrument Panel Tie Bar Replacement . Is the action complete? | Go to Step 7 | -- | ||||||||||||
7 |
Were any of these conditions found? | Go to Step 10 | Go to Step 8 | ||||||||||||
8 | Inspect the mode and temperature doors and seals for warping or cracking. Are the doors in normal condition? | Go to Step 11 | Go to Step 9 | ||||||||||||
9 | Replace the appropriate door and/or seals. Is the repair complete? | Go to Step 11 | -- | ||||||||||||
10 | Remove any obstructions or foreign material found. Is the action complete? | Go to Step 11 | -- | ||||||||||||
11 | Install the I/P tie bar. Refer to Instrument Panel Tie Bar Replacement . Is the action complete? | Go to Step 12 | -- | ||||||||||||
12 | Operate the system to verify the repair. Did you find and correct the condition? | System OK | Go to Step 2 |
Step | Action | Yes | No | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DEFINITION: Noise originating from the HVAC module. | |||||||||||||||
1 | Were you sent here from Symptoms or another diagnostic table? | Go to Step 2 | |||||||||||||
2 |
Is a scrape or pop noise evident when selecting modes or temperature settings? | Go to Step 6 | Go to Step 3 | ||||||||||||
3 | Is a tick/click, chirping, groaning or scraping noise present, but decreases as blower motor speed is decreased? | Go to Step 6 | Go to Step 4 | ||||||||||||
4 | Is an air rush/whistle noise evident in all modes but not all temperature settings? | Go to Step 6 | Go to Step 5 | ||||||||||||
5 | Is an air rush/whistle noise evident only in defrost or floor mode? | Go to Step 6 | Go to Step 6 | ||||||||||||
6 | Remove the instrument panel (I/P) tie bar. Refer to Instrument Panel Tie Bar Replacement . Is the action complete? | Go to Step 7 | -- | ||||||||||||
7 |
Were any of these conditions found? | Go to Step 10 | Go to Step 8 | ||||||||||||
8 | Inspect the mode and temperature doors and seals for warping or cracking. Are the doors in normal condition? | Go to Step 11 | Go to Step 9 | ||||||||||||
9 | Replace the appropriate door and/or seals. Is the repair complete? | Go to Step 11 | -- | ||||||||||||
10 | Remove any obstructions or foreign material found. Is the action complete? | Go to Step 11 | -- | ||||||||||||
11 | Install the I/P tie bar. Refer to Instrument Panel Tie Bar Replacement . Is the action complete? | Go to Step 12 | -- | ||||||||||||
12 | Operate the system to verify the repair. Did you find and correct the condition? | System OK | Go to Step 2 |